Saturday, October 2, 2010

One of the tallest residential buildings (117 floors) in Mumbai, India..................

Totally unbelievable !!

 

   One of the tallest Residential buildings in the world coming
 Up in Mumbai INDIA Flat  price starting  7 crore  
 (1.4 million dollars)

 
"World One"  at Lower Parel

 
The Structure


Typical floor plan for 1st to 40th Floor

 
Tentative Floor plan for 1st to 40th Floor (3 & 4 BHK Wing)


The Flat layout of 4 BHK would be similar to 3 BHK only one room would be
 Added and some differences in the dimensions.

The above information is according to the description by the Sales Manager and
 a bit of imagination, as none of the plans were shown at this pre-launch stage,
 Only some dimensions were disclosed, therefore it may vary a bit from the actual.

It was told that as it is only pre-launch, so only after giving a cheque of Booking
 amount, a glimpse of the floor plans would be shown but it will not be given.

Pricing Details


Base Rate                 Rs. 23,000 psf (3 BHK)
                                  Rs. 22,500 psf (4BHK)
                                  Rs. 30,303 psf (Villas)

Floor Rise                    Rs. 180 per floor (from 7th floor for 3BHK & 4BHK)
                                                              (from 42nd floor for Villas)

Car Parking                Rs. 12.6 Lac
per car parking
                                  (2 CPs compulsory for 3 BHK)
                                  (3 CPs compulsory for 4BHK & Villas)

Maintenance              Rs. 12 psf
per month

Total Cost                   Rs. 7.11 Cr
(For a 3BHK at 10th level)
                                  Rs. 8.25 Cr (For a 4BHK at 10th level)
                                  Rs. 21.97 Cr (For a Villa at 44th level)


 
                                 
 Project   Detail related to   Description   Details  
 World One   Location   Lower Parel      
    Land details   17.5 acre plot of Srinivas Cotton Mills   Auctioned by National Textile Corporation in 2005  
    Development details   3 residential towers, a high-end shopping avenue and a world-class office building.      
    Height & Areas   Over 117 storeys (Over 450 meters or 1,450-feet)   Total 300 exclusive homes  
    landscape area   2 lakh sq ft (5 acres)      
    Sports club   80,000 sq ft   Height of 175 feet above ground  
    Cost   Rs 2,000 crore   (approx US$ 440 million).  
    Funding   Customer receipts, debt finance and internal accruals   Received more than Rs1,000 crore from HDFC, Singapore funds GIC and Temasek  
    Expected Revenue   Rs 5,000 crore      
    Certification   Gold LEED Certified building    By the Green Building Council  
    View   60 km from the building   360° views including Bandra Worli Sealink,Race Course & Arabian Sea.  
    Type of flats   3 & 4 bedroom World Residences      
       Lavish World Villas with their own private pools      
       Limited number of duplex World Mansions      
    Rate   Rs 25,000 per sq ft.   Rs.7.5 to Rs.50 crore ($1.5 million to $12 million)  
    Sales Commencement   End of June, 2010      
    Architectural Consultant   Pei Cobb Freed & Partners   New York based  
    Structural Consultant   Leslie E Robertson Associates   New York based  
    Construction by   Samsung Constructions, L&T and Grocon      
    Technology to be used   High-capacity concrete pumps   Ability to pump to heights over 450 metres  
       High-capacity construction hoists   With a speed of up to 2 m/sec to move men and materials  
    Super- Structure   High-strength concrete   Supported by large reinforced concrete mats and piles  
    Elevation type   Mega Structure   First time in India  
    Amenities   Club House   3-level club-house and spa  
       Kitchens   Bulthaup (Germany)  
       Bath fittings   Antonio Lupi (Italy), Dornbracht (Germany), Gessi (Italy), Villeroy & Boch (Germany/France)  
       Elevators   Mitsubishi (Japan), Otis (USA)  
       Flooring   Imported Italian marbles  
    Safety Measures   Fully automated fire detection and sprinkling systems      
       Dedicated pressurized fire staircases      
       High-speed fire lifts      
    Eco-friendly Measures   100 per cent water harvesting and recycling   reducing water consumption by upto 50%  
       Using VRV air-conditioning and solar energy for common areas   slashing electricity consumption by over 40 percent  
       Waste segregation and recycling.      
    Material to be consumed   250,000 cubic meters of concrete      
       35,000 metric tons of steel rebar      
       14 million man hours.      
       18 elevators travelling at upto 8 metres/sec   over 25 ft/sec, more than 2∏ storeys/sec  
    Completion   2014      

 
ELEVATION


 








Posted via email from tamalb's posterous

No comments:

Post a Comment